4.5 – Division C: Showing Your Work

Showing Your Work With our first two Divisions, we cover the application of the Code, the intent behind it, and the individual rules that a building needs to meet in order to comply. For Division C, we look at Administrative Provisions – or the paperwork you might say. Again, this can seem like a fairly simple point – but when you think about everything that can be required for a building to be designed, documentation becomes a very crucial part of that.

Elevation drawings of a house
Sample elevation drawings; these show the face and features of a house

Let’s think about a new building; where is it being built? Not only would we need an address (which seems like an obvious point), we would also need a Site Plan to confirm where the building is being placed, and to also know what other things might be on that site – trees, structures, where property lines are, where the roads and access is. How tall is the building? We would need Elevation drawings (as in, the exterior faces of the building) to confirm its height – not just in storeys, but also, in overall height in meters. The elevations would also tell us a number of other things – like confirming the place and number of windows, doors, or openings, or the types of finishes of siding being used on each face.

What if our building needs a sprinkler system? It’s pretty hard to review whether or not sprinkler heads are in the right location, or if the location of those services in a building are in a protected space, without the drawings to confirm it. Even knowing the version of the design Standard used to plan the system is important, because rules can change or improve from version to version – which the plans would outline. We would also need to confirm if a fire pump, or standpipes (the big pipes often in exit stairs which allow a fire fighter to tie into each floor) would be included in these drawings – and each come with rules that the Official would need to be able to check.

Structural steel drawings for a warehouse

Structural steel drawings for an industrial warehouse, including roof

How does the building stay up? Structural drawings need to outline not just where the building Foundation is – but also outline how sections are reinforced, where loads are carried (not to mention, what size loads were used for the design), even the ways the building is designed to handle wind, settlement, frost, and even earthquakes. If the building includes something like a rooftop terrace, platform, or a “Green Roof” (plants or grass on a rooftop for the occupants to enjoy – becoming more popular all the time), our drawings would need to show that they’ve considered the extra weight and strain caused by the earth, sod, and plants. The same applies to our envelope, our heating systems, our ductwork, and plumbing – all of which require sizing, and sometimes, protection from other things within the building – which can’t be confirmed without drawings.

Sankey diagram of energy flowing through a building

A Sankey diagram – showing the flow of energy source through a building

Energy efficiency is a factor included in all new building designs – whether it is through Prescriptive compliance with the Code, or through Performance of the by Building Energy Modelling – documentation would need to be included to allow these factors to be reviewed; what systems were used, how efficient they are, where improvements beyond the minimum the Code requires have been made, even the type of software used is all needed for us to complete a full review. Even if a model isn’t being used to meet the Energy Code, many of the details included in the building, right down to how many lights, and at what power they use would need to be included – so that the Official is able to compare against the rules outlined in the Code.

Remember earlier when we mentioned Alternative Compliance? It can be hard enough to ensure that a proposed project meets the Code when it’s Prescriptive – it’s nearly impossible to do if the right documentation isn’t part of the project package for Performance design. Not only would the Official be guessing at how compliance is intended to be achieved, but they would not be able to assess the elements that would allow that to happen.

This needs to include everything – from the Prescriptive Sentences that the design will meet through some other means, the methods that the design used to ensure it did as well a job as the Code to meet that requirement, supporting statistics, calculations, rulings from other regions, and anything else that makes a convincing case for why this design meets, or exceeds, the Prescriptive Code. While the Code doesn’t specifically require any certain “qualification” in order to submit a Performance path solution to a Prescriptive Code requirement (like being say, an engineer or an architect), it does require demonstration that the person (or persons) submitting the proposal are capable and the rationale is sound; as the AHJ – the Official can certainly request review, testing, and follow up from a design professional with these designations, if they feel it is necessary (and, if it means providing additional protection from liability from the design being proposed.

Remember our Regulations, and the Letters of Undertaking? Building on what Division C requires for a permit submission – the Regulations follow, including the ability for an Official to request this documentation if they feel that it’s necessary. This means that, if the solution seems complex enough, you’re more than within your right to ask for a Letter of Undertaking, to ensure it’s followed.