2.8 – Different Paths, Same Conclusions
Same Conclusions So, you’ve got your different tools for meeting compliance – you can follow the letter of the Code, rules as written, and be completely Prescriptive – or you can take a broader, more imaginative approach, in meeting their intent through Performance based design. Using one path doesn’t lock you out of the other; designers have the option to use these paths in combination – from as little as meeting a single element through Performance, to nearly the entire design, with selective elements still Prescriptive. Anything as small as replacing the type of insulation that’s being used in a wall, because something new on the market might give you a bit more resistance to loss of heat, all the way through to using an unconventional material – like hempcrete to build the entire building – without following the requirements of a typical structure.

Regardless of which path, and how much (or how little) either is used – the purpose is going to be the same; to meet the minimum level of compliance by design – however it is that this is going to be achieved (through the direction and proposal of the designer, of course).
As we already mentioned – there are advantages and disadvantages to both paths; where the Prescriptive can be rigid, or conservative – the Performance Path can be flexible, and creative. At the same time, where the Performance requires complex assessment, study, and data collection – the Prescriptive is established, it’s familiar, and it’s usually very simple and straightforward. Both can bring a project to compliance, if used correctly – so it is important to ensure that an Official is mindful of what they’re reviewing, and with what intent the designer is looking to meet compliance.
Which path ultimately is chosen by the designer will depend largely on the building being built, and the requirement that needs to be met. These can vary from project to project, even if the solutions are similar in different instances; as always, complexity and preference can be leading factors in this choice. Remember, as the AHJ – it’s not your responsibility to direct a project to either path – only to outline the requirements needed to be met for compliance with the Code. It’s up to the designer to provide solutions – whether they are prescriptive, and direct, or performance, and complex.
Generally speaking – designers will lean on the Prescriptive Path, when the requirements can be fairly easily met as part of their design process; it’s generally not too difficult to make sure that the minimum ceiling height, or the fire resistance rating between two suites, or the insulation value in an exterior wall are met – because the Code provides fairly clear-cut requirements here. As we’ve said – you can simply look up the requirement, and compare it to the proposal – determining compliance, or not. And because these requirements are straightforward, as designers become more and more used to them, they become almost a default in the plan design – typical, standard, and accepted routine details. This also makes it easier for trades in construction to know what to expect with the project, because they will see the same construction materials, assemblies, and requirements, over and over – saving time, money, and work for both the designers, as well as the builders looking to material take offs for a would-be project.
On the other hand, designers will lean into the Performance path, when meeting requirements can otherwise be problematic as part of the use, layout, or other conflicting features of their project. Maybe the number of units in your apartment makes the hallways narrower than Code would normally allow – or the combination of uses creates a situation that’s more hazardous to the occupants. Maybe the building would normally require a sprinkler system because of its size and use – but the installation isn’t practical.
There are any number of reasons why the Prescriptive requirements might not work, or even just not be the approach that a designer wishes to take – especially when we’re talking about the renovation, and adaptation of existing buildings (which may either not meet the prescriptive requirements of the Code – or were never designed in a way that could work for how it’s being used today). In these cases, when comparing what the Prescriptive would require to the design as it is, it might be more cost effective, more practical, or just simply more desirable to meet what the Code intends, rather than what it’s specifically asking.
As I mentioned before, while this approach does provide flexibility – it can be really difficult to assess how one solution, might meet the intention of an established one – so be sure your designer has got a very extensive proposal on how it’ll do just that. There are no straightforward solutions when it comes to Performance based design – even if the solution is something that’s accepted elsewhere or is based on sound reasoning – it is critical that the Official gives it the utmost consideration and review, in order to ensure that compliance is truly met.