4.4 – Division B: Acceptable Solutions

Acceptable Solutions Where Division A covers the Where and What our Code applies to – Division B is the How; after all, its title is “Acceptable Solutions” – because that’s exactly what it contains. You might recall from an earlier module, our two paths for compliance – Prescriptive, and Performance – well, each Part within Division B covers every Prescriptive rule that a building may need to meet, in order for us to say it complies with the Code.

Barns and other agricultural buildings on a farm
Agricultural buildings – outlined as Farm Buildings under the Code

Part 1 covers the General rules and requirements for this Division of the Code; it references back to Division A for things like definitions, points us in the direction of what weather and climate data we might need as part of a design or review, and even the edition of any applicable Standard that the Code might be directing its users to.

Part 2 within this Volume covers Farm buildings – the rules that apply if the core use of the building is raising farm animals, storing crops, housing farm equipment, or processing of goods from the Farm itself. As we’ve mentioned before, there are a lot of requirements in this Part which added potential hurdles to the Nova Scotia industry – so it has been held in reserve at this time – though that may change in the future.

Part 3 covers Fire Protection, Occupant Safety (within building), and Accessibility – as they apply to all buildings. Unless another Part says otherwise, when a looking for what rules apply to an aspect of a building’s design – you’ll find it here. This makes up a substantial portion of the rules that an Official needs to consider, when it comes to assuring compliance with the Code.

Section details of a wall and roof assembly

Sample section details, showing the required construction of a wall and roof

Part 4 outlines Structural Design – all of the factors in which, a designer (usually, a structural engineer) needs to consider when planning the supports, floors, beams, columns, and foundation of a building. While this is one of the Prescriptive portions – Part 4 (and a number of later Parts of our Code) does not tell the designer the exact way to meet Code – but instead, outlines all of the factors, and calculation methods, that the design needs to include, to be comply. Think of this more along the lines of how a designer needs to approach their design – and less about the checklist of requirements they would need to meet for compliance.

Part 5 covers Environmental Separations – how our buildings maintain heat, air, and moisture transfer between the inside, and the outside. Like Part 4, this is largely a design factor list – there are any number of ways that a building envelope (our walls, ceilings, roofs, and floors at the outside of the Building) can be designed, as long as they check all the boxes in this Part. Generally, the Official will see the requirements of this portion being met in a lot of similar ways – types of materials, section details in the drawings – but there are many different ways in which a design could be compliant with Part 5, depending on how the designer wants to approach it.

Sewage and interceptor pits in an underground plumbing installation

Sewage and intercept pits as part of an underground plumbing design

Part 6 outlines Heating, Ventilating, and Air-Conditioning – how the systems that do, well, exactly those things, are designed to work within our buildings. This is another check-list portion, as there are so many options when it comes to how our buildings are heated – which can tie how air is moved through the building, and the equipment itself is sized. Unlike Parts 4, and 5, however – there are some more clear-cut directions in this section about volume of air that needs to be delivered to different rooms and spaces within a building, but largely, it’s up to the designer to show how this Part is met.

Part 7 – while very limited – covers Plumbing Services – the washroom fixtures, and service water systems needed within our buildings. In short – it really just directs us to the National Plumbing Code, which makes sense, as that Code already exists, and does not need to be simply repeated here.

Part 8 outlines Safety Measures at Construction and Demolition sites – which while not a directly tied to the building itself, does provide us with rules for how to keep the public safe from a building on its way up, or down. This can be a very useful tool for the Official – as there are specific protection requirements in this Part, that can be used for directing compliance (which also means, preparing and issuing orders); work near the public right-of-way (like sidewalks and roads), work overhead, even the signage and identification of hazards on a job site are covered here.

Finally, Part 9 covers Housing and Small Buildings – sort of a subset of Part 3, that can be used for some types of smaller houses, commercial, and industrial buildings, with more direct and simple rules that may not require a professional designer to DeCode. When we had previously talked about sections of the Code reaching out to different Parts, because the rules they would need to follow might be found in other places – this is one of the Parts that often fall into that category; where Part 9 covers more simple buildings, sometimes there may be elements that a designer wishes to use that are – less simple. In these cases, the other Parts we’ve noted above might be used, to help cover those additional items.